This site uses cookies. By continuing to browse the ConceptDraw site you are agreeing to our Use of Site Cookies.
This vector stencils library contains 47 SysML activity diagram symbols.
Use it to design your SysML activity diagrams using ConceptDraw PRO diagramming and vector drawing software.
"Activity diagrams are constructed from a limited number of shapes, connected with arrows. The most important shape types:
- rounded rectangles represent actions;
- diamonds represent decisions;
- bars represent the start (split) or end (join) of concurrent activities;
- a black circle represents the start (initial state) of the workflow;
- an encircled black circle represents the end (final state).
Arrows run from the start towards the end and represent the order in which activities happen." [Activity diagram. Wikipedia]
The vector stencils library "Activity diagram" is included in the SysML solution from the Software Development area of ConceptDraw Solution Park.
Action
Action, action,
Call behavior action
Call behavior action, call behavior action, action,
Accept event action
Accept event action, accept event action,
Accept time event action
Accept time event action, accept time event action,
Send signal action
Send signal action, send signal action,
Activity
Activity, activity, frame,
Activity final node
Activity final node, initial node, activity final node,
Flow final node
Flow final node, flow final node,
Activity parameter node
Activity parameter node, activity parameter node,
Control operator node
Control operator node, control operator node,
Control operator - frame
Control operator - frame, control operator frame,
Decision/Merge node
Decision/Merge node, decision node, merge node, control node, activity node,
Fork/Join node
Fork/Join node, fork node, join node, control node,
Initial node
Initial node, initial node, control node,
isControl
isControl, isControl node, action,
isStream
isStream, isStream node, action,
isStream 2
isStream 2, isStream node, action,
isStream 3
isStream 3, isStream node, activity parameter node,
Local precondition
Local precondition, local precondition node, action,
Local postcondition
Local postcondition, local postcondition node, action,
NoBuffer
NoBuffer, noBuffer node, action,
Object node
Object node, object node,
Object node 2
Object node 2, pin, object node, action,
Optional
Optional, optional, action,
Optional 2
Optional 2, optional, activity parameter node,
OverWrite
OverWrite, overwrite, action,
Parameter set
Parameter set, parameter set, action,
Parameter set 2
Parameter set 2, parameter set, activity, frame,
Probability
Probability, probability, action,
Probability 2
Probability 2, probability,
Rate
Rate, rate,
Rate 2
Rate 2, rate,
Rate 3
Rate 3, rate,
Rate 4
Rate 4, rate,
Rate 5
Rate 5, rate, activity parameter node,
Rate 6
Rate 6, rate, action,
Control flow
Control flow, control flow, action,
Control flow 2
Control flow 2, control flow, action,
Object flow
Object flow, object flow, action,
Object flow 2
Object flow 2, object flow, action,
Probability path
Probability path, probability,
Rate path
Rate path, rate,
In block definition diagram, activity, association
In block definition diagram, activity, association, block definition diagrams, activity, association, activity, frame, activity,
Activity partition
Activity partition, activity partition, swimlane,
Activity partition - action
Activity partition - action, action, activity partition,
Interruptible activity region
Interruptible activity region, structured activity node, interruptible activity region,
Structured activity node
Structured activity node, structured activity node,
The PERT chart shows the logical connections and consequence of a set of tasks. PERT charts the time period for problem solving and the implementation plan for all activities along the critical path. The PERT chart is also known as a precedence diagram or project network diagram.
"The Program (or Project) Evaluation and Review Technique, commonly abbreviated PERT, is a statistical tool, used in project management, that is designed to analyze and represent the tasks involved in completing a given project. ...
PERT is a method to analyze the involved tasks in completing a given project, especially the time needed to complete each task, and to identify the minimum time needed to complete the total project.
PERT was developed primarily to simplify the planning and scheduling of large and complex projects. ...
A network diagram can be created by hand or by using diagram software. There are two types of network diagrams, activity on arrow (AOA) and activity on node (AON). Activity on node diagrams are generally easier to create and interpret." [Program Evaluation and Review Technique. Wikipedia]
The PERT chart is one of the Seven Management and Planning Tools (7 MP tools, Seven New Quality Tools).
The PERT chart template for the ConceptDraw PRO diagramming and vector drawing software is included in the solution "Seven Management and Planning Tools" from the Management area of ConceptDraw Solution Park.
PERT chart template
PERT chart template, time interval, task, project start, project finish, milestone,
Legend
Legend, legend,
This purchase order processing UML activity diagram was created on the base of activity diagram from the software architecture documentation wiki of the Software Engineering Institute (SEI) of Carnegie Mellon University (CMU).
[wiki.sei.cmu.edu/ sad/ index.php/ Image:PurchaseOrderActivityDiagram.png]
"A purchase order (PO) is a commercial document and first official offer issued by a buyer to a seller, indicating types, quantities, and agreed prices for products or services. Acceptance of a purchase order by a seller forms a contract between the buyer and seller, so no contract exists until the purchase order is accepted. It is used to control the purchasing of products and services from external suppliers.
Creating a purchase order is typically the first step of the purchase to pay process in an ERP system." [Purchase order. Wikipedia]
This purchase order processing UML activity diagram example was created using the ConceptDraw PRO diagramming and vector drawing software extended with the ATM UML Diagrams solution from the Software Development area of ConceptDraw Solution Park.
UML activity diagram of purchase order processing
UML activity diagram of purchase order processing , send signal action, initial node, horizontal swimlanes, activity partition, activity group, fork node, join node, decision node, merge node, activity final node, activity edge, object flow edge, action, accept event action,
The vector stencils library "Activity diagram" contains 47 symbols.
Use it to design your SysML activity diagrams using ConceptDraw PRO diagramming and vector drawing software.
"Activity diagrams are constructed from a limited number of shapes, connected with arrows. The most important shape types:
- rounded rectangles represent actions;
- diamonds represent decisions;
- bars represent the start (split) or end (join) of concurrent activities;
- a black circle represents the start (initial state) of the workflow;
- an encircled black circle represents the end (final state).
Arrows run from the start towards the end and represent the order in which activities happen." [Activity diagram. Wikipedia]
The SysML shapes example "Design elements - Activity diagram" is included in the SysML solution from the Software Development area of ConceptDraw Solution Park.
SysML activity diagram symbols
SysML activity diagram symbols, structured activity node, send signal action, rate, probability, pin, parameter set, overwrite, optional, object node, object flow, noBuffer node, local precondition node, local postcondition node, isStream node, isControl node, interruptible activity region, initial node, control node, initial node, fork node, join node, control node, flow final node, decision node, merge node, control node, activity node, control operator node, control operator frame, control flow, call behavior action, block definition diagrams, activity, association, activity, frame, activity partition, swimlane, activity parameter node, activity final node, activity, action, activity partition, action, accept time event action, accept event action,